| A Dashboard for Design Risk Management. Proposal for a Risk-Based Design Support and Lifelong Feedback Gathering System C Martani Risk Management in Architectural Design, 57-76, 2015 | | 2015 |
| A new model for evaluating the future options of integrating ground source heat pumps in building construction C Martani, Y Jin, K Soga, S Scholtes UCL STEaPP, 2015 | 3 | 2015 |
| A new process for the evaluation of the net-benefit of flexible ground-floor ceiling in the face of use transition uncertainty C Martani, L Cattarinussi, BT Adey Journal of building engineering 15, 156-170, 2018 | 12 | 2018 |
| A New Risk Management Methodology for Infrastructure Based on Real-Time Monitoring and Dynamic Interventions: An Example Application on an Air Handling Unit F Rota, C Talamo, G Paganin, C Martani CivilEng 1 (2), 132-153, 2020 | | 2020 |
| A review of the state-of-the-art in railway risk management C Martani, N Papathanasiou, BT Adey 1st Asian Conference on Railway Infrastructure and Transport, Jeju, Korea, 2016 | 8 | 2016 |
| Application of the Dashboard for Risk Management: The Case Study of Two Buildings of Worship C Martani Risk Management in Architectural Design, 79-95, 2015 | | 2015 |
| C9/ Infrastructureless Parking System C Martani Senseable City Guide to Copenhagen 2, pp. 51-58, 2011 | | 2011 |
| Considering automated vehicle deployment uncertainty in the design of optimal parking garages using real options AB Elvarsson, C Martani, BT Adey Journal of Building Engineering, 101703, 2020 | 3 | 2020 |
| Criosfera - Le nevi, I ghiacciai e le calotte polari C Martani Quale clima ci attende? Scenari futuri fra catastrofismo e negazionismo, pp …, 2008 | | 2008 |
| D3. 6 Risk Assessment Methodology N Papathanasiou, BT Adey, M Burkhalter, C Martani | | 2018 |
| Defining road service to facilitate road infrastructure asset management BT Adey, M Burkhalter, C Martani Infrastructure Asset Management 7 (4), 240-255, 2019 | 4 | 2019 |
| Design with uncertainty: the role of future options for infrastructure integration C Martani, Y Jin, K Soga, S Scholtes Computer‐Aided Civil and Infrastructure Engineering 31 (10), 733-748, 2016 | 11 | 2016 |
| DESTination RAIL–D3. 2 Risk Assessment Methodology N Papathanasiou, C Martani, BT Adey ETH Zurich, 2016 | | 2016 |
| DESTination RAIL–D3. 5 Principles for estimating and communicating the risk of neglecting maintenance BT Adey, C Martani, N Papathanasiou, M Burkhalter ETH Zurich, 2018 | | 2018 |
| DESTination RAIL–D3. 6 A risk assessment methodology for railway infrastructure networks N Papathanasiou, BT Adey, M Burkhalter, C Martani ETH Zurich, 2018 | | 2018 |
| Determination of risk-reducing intervention programs for railway lines and the significance of simplifications M Burkhalter, C Martani, BT Adey Journal of infrastructure systems 24 (1), 04017038, 2018 | 14 | 2018 |
| Development of intervention programs for inland waterway networks using genetic algorithms C Kielhauser, C Martani, BT Adey Structure and Infrastructure Engineering 14 (5), 550-564, 2018 | 6 | 2018 |
| ENERNET: Studying the dynamic relationship between building occupancy and energy consumption C Martani, D Lee, P Robinson, R Britter, C Ratti Energy and Buildings 47, 584-591, 2012 | 218 | 2012 |
| Estimating and communicating the risk of neglecting maintenance BT Adey, C Martani, N Papathanasiou, M Burkhalter Infrastructure Asset Management 6 (2), 109-128, 2018 | 10 | 2018 |
| Estimating the Resilience of, and Targets for, a Transport System Using Expert Opinion C Martani, BT Adey, I Robles, F Gennaro, L Pardi, I Beltran-Hernando, ... Infrastructure Asset Management, 1-15, 2021 | | 2021 |