BIM-based decision-support method for master planning of sustainable large-scale developments JI Kim, J Kim, M Fischer, R Orr Automation in Construction 58, 95-108, 2015 | 96 | 2015 |
Sustainable, age-friendly cities: An evaluation framework and case study application on Palo Alto, California J Ruza, JI Kim, I Leung, C Kam, SYM Ng Sustainable Cities and Society 14, 390-396, 2015 | 57 | 2015 |
Integration of BIM and GIS for formal representation of walkability for safe routes to school programs JI Kim, B Koo, S Suh, W Suh KSCE Journal of Civil Engineering 20 (5), 1669-1675, 2016 | 46 | 2016 |
Feasibility of LoRa for Smart Home Indoor Localization K Kim, S Li, M Heydariaan, N Smaoui, O Gnawali, W Suh, MJ Suh, JI Kim Applied Sciences 11 (1), 415, 2021 | 41 | 2021 |
Efficient customer selection process for various DR objectives J Kwac, JI Kim, R Rajagopal IEEE Transactions on Smart Grid 10 (2), 1501-1508, 2019 | 32 | 2019 |
Feasibility study on an evidence-based decision-support system for hospital site selection for an aging population JI Kim, DM Senaratna, J Ruza, C Kam, S Ng Sustainability 7 (3), 2730-2744, 2015 | 30 | 2015 |
Evaluation framework for BIM-based VR applications in design phase JI Kim, S Li, X Chen, C Keung, M Suh, TW Kim Journal of Computational Design and Engineering 8 (3), 910-922, 2021 | 28 | 2021 |
Empirical Study of Identifying Logistical Problems in Prefabricated Interior Wall Panel Construction Y Lee, JI Kim, A Khanzode, M Fischer Journal of Management in Engineering 37 (3), 05021002, 2021 | 25 | 2021 |
Construction Parts in Building Projects: Definition and Case Study N Zhao, C Kam, J TY Lo, JI Kim, M Fischer Journal of Management in Engineering 34 (4), 04018014, 2018 | 21 | 2018 |
Evaluating risks using simulated annealing and building information modeling DW Ryu, JI Kim, S Suh, W Suh Applied Mathematical Modelling 39 (19), 5925-5935, 2015 | 21 | 2015 |
Developing a BIM-based MUVR treadmill system for architectural design review and collaboration CCW Keung, JI Kim, QM Ong Applied Sciences 11 (15), 6881, 2021 | 18 | 2021 |
Exploring the Factor-Performance Relationship of Integrated Project Delivery Projects: A Qualitative Comparative Analysis JH Yu, SE Yoo, JI Kim, TW Kim Project Management Journal 50 (3), 335-345, 2019 | 18 | 2019 |
Vision-based surveillance system for monitoring traffic conditions MW Park, J In Kim, YJ Lee, J Park, W Suh Multimedia Tools and Applications 76 (23), 25343-25367, 2017 | 17 | 2017 |
Mathematical Analysis for Roundabout Capacity W Suh, JI Kim, H Kim, J Ko, YJ Lee Mathematical Problems in Engineering 2018, 2018 | 16 | 2018 |
Generation of stacking plans for prefabricated exterior wall panels shipped vertically with A-frames Y Lee, JI Kim, F Flager, M Fischer Automation in Construction 122, 103507, 2021 | 15 | 2021 |
The impact of LEED-Energy Star certified office buildings on the market value of adjoining buildings in New York City MJ Suh, AR Pearce, Y Song, YH Kwak, JI Kim, Y Zhang Journal of Green Building 14 (1), 31-52, 2019 | 10 | 2019 |
Identifying Characteristics of PPP Projects for Healthcare Facilities for the Elderly Based on Payment Mechanisms in China K Dai, S Li, J In Kim, M Jae Suh Journal of Management in Engineering 37 (6), 05021009, 2021 | 9 | 2021 |
Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction JI Kim, M Fischer, C Kam Automation in Construction 96, 378-397, 2018 | 9 | 2018 |
Automated Generation of Precast Concrete Slab Stacks for Transportation in Offsite Construction Projects GH Lee, JI Kim, C Koo, TW Kim Journal of Construction Engineering and Management 148 (8), 04022072, 2022 | 8 | 2022 |
Automated Components–Vehicle Allocation Planning for Precast Concrete Projects JY Jang, JI Kim, C Koo, TW Kim Journal of Management in Engineering 38 (6), 04022059, 2022 | 7 | 2022 |