Follow
Anis Gharbi
Anis Gharbi
Professor of Operations Research, Industrial Engineering Department, King Saud University
Verified email at ksu.edu.sa
Title
Cited by
Cited by
Year
Optimal scheduling of a two-stage hybrid flow shop
M Haouari, L Hidri, A Gharbi
Mathematical Methods of Operations Research 64 (1), 107-124, 2006
932006
Minimizing makespan on parallel machines subject to release dates and delivery times
A Gharbi, M Haouari
Journal of scheduling 5 (4), 329-355, 2002
922002
Optimal parallel machines scheduling with availability constraints
A Gharbi, M Haouari
Discrete Applied Mathematics 148 (1), 63-87, 2005
652005
Tight bounds for the identical parallel machine scheduling problem
M Haouari, A Gharbi, M Jemmali
International Transactions in Operational Research 13 (6), 529-548, 2006
532006
Scheduling IT staff at a bank: a mathematical programming approach
M Labidi, M Mrad, A Gharbi, MA Louly
The Scientific World Journal 2014, 2014
362014
An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines
M Haouari, A Gharbi
Operations Research Letters 31 (1), 49-52, 2003
302003
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
A Gharbi, T Ladhari, MK Msakni, M Serairi
European Journal of Operational Research 231 (1), 69-78, 2013
282013
An approximate decomposition algorithm for scheduling on parallel machines with heads and tails
A Gharbi, M Haouari
Computers & operations research 34 (3), 868-883, 2007
272007
Energetic reasoning revisited: application to parallel machine scheduling
L Hidri, A Gharbi, M Haouari
Journal of scheduling 11, 239-252, 2008
242008
Lower bounds for scheduling on identical parallel machines with heads and tails
M Haouari, A Gharbi
Annals of Operations Research 129, 187-204, 2004
232004
Fast lifting procedures for the bin packing problem
M Haouari, A Gharbi
Discrete Optimization 2 (3), 201-218, 2005
222005
Jackson's semi-preemptive scheduling on a single machine
A Gharbi, M Labidi
Computers & Operations Research 37 (12), 2082-2088, 2010
142010
New efficient lower bound for the hybrid flow shop scheduling problem with multiprocessor tasks
L Hidri, A Gharbi
IEEE access 5, 6121-6133, 2017
122017
Minimizing expected attacking cost in networks
A Gharbi, MN Azaiez, M Kharbeche
Electronic Notes in Discrete Mathematics 36, 947-954, 2010
102010
A computational study of the two-machine no-wait flow shop scheduling problem subject to unequal release dates and non-availability constraints
M Labidi, A Kooli, T Ladhari, A Gharbi, US Suryahatmaja
IEEE Access 6, 16294-16304, 2018
92018
Bounding strategies for scheduling on identical parallel machines
M Haouari, A Gharbi, M Jemmali
2006 international conference on service systems and service management 2 …, 2006
92006
New lower bounds for flow shop scheduling
A Gharbi, A Mahjoubi
International Journal of Humanities and Management Sciences (IJHMS) 1 (125), 58, 2013
82013
Statistical modeling of emergency medical services’ response and rescue times to road traffic crashes in the Kingdom of Saudi Arabia
A Al-Zabidi, M Almannaa, M Elhenawy, A Gharbi
Case Studies on Transport Policy 10 (4), 2563-2575, 2022
72022
Physician scheduling using goal programming-an application to a large hospital in Saudi Arabia
A Gharbi, M Louly, MN Azaiez
2017 4th international conference on control, decision and information …, 2017
72017
The nonpermutation flowshop scheduling problem: adjustment and bounding procedures
A Gharbi, M Labidi, MA Louly
Journal of Applied Mathematics 2014, 2014
72014
The system can't perform the operation now. Try again later.
Articles 1–20