Follow
Oussama Ben-Ammar
Oussama Ben-Ammar
Associate Professor, IMT Mines Alès / EuroMov DHM
Verified email at mines-ales.fr
Title
Cited by
Cited by
Year
A state of the art on supply planning and inventory control under lead time uncertainty
A Dolgui, O Ben-Ammar, F Hnaien, MA Louly
Studies in Informatics and Control 22 (3), 255-268, 2013
892013
New mixed integer approach to solve a multi-level capacitated disassembly lot-sizing problem with defective items and backlogging
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Journal of Manufacturing Systems 56, 50-57, 2020
342020
Planned lead times optimization for multi-level assembly systems under uncertainties
O Ben-Ammar, A Dolgui, DD Wu
Omega 78, 39-56, 2018
332018
Optimization of multi-period supply planning under stochastic lead times and a dynamic demand
O Ben-Ammar, B Bettayeb, A Dolgui
International Journal of Production Economics 218, 106-117, 2019
322019
Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality
O Ben-Ammar, B Bettayeb, A Dolgui
International Journal of Production Research 58 (4), 1144-1160, 2020
292020
Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Computers & Industrial Engineering 159, 107468, 2021
282021
Optimal order release dates for two-level assembly systems with stochastic lead times at each level
O Ben-Ammar, A Dolgui
International Journal of Production Research 56 (12), 4226-4242, 2018
272018
Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty
S Thevenin, O Ben-Ammar, N Brahimi
European Journal of Operational Research 303 (3), 1199-1215, 2022
252022
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC MIM 2019, 2019
212019
Disassembly scheduling problem: literature review and future research directions
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC MIM 2019, 2019
212019
Mathematical model for supply planning of multi-level assembly systems with stochastic lead times
O Ben-Ammar, H Marian, D Wu, A Dolgui
IFAC Proceedings Volumes 46 (9), 389-394, 2013
202013
Supply planning and inventory control under lead time uncertainty: A review
O Ben-Ammar, A Dolgui, F Hnaien, MA Louly
IFAC Proceedings Volumes 46 (9), 359-370, 2013
182013
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
I Slama, O Ben-Ammar, S Thevenin, A Dolgui, F Masmoudi
European Journal of Operational Research 303 (3), 1183-1198, 2022
162022
A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times
O Ben-Ammar, P Castagliola, A Dolgui, F Hnaien
Computers & Industrial Engineering 149, 106794, 2020
152020
An overview of approaches and methodologies for supporting smallholders: ICT tools, blockchain, business models, sustainability indicators, simulation models
F Longo, G Mirabelli, V Solina, L Belli, CB Abdallah, O Ben-Ammar, ...
Procedia Computer Science 217, 1930-1939, 2023
122023
CONFIGURATION D'UN SYSTÈME D'ASSEMBLAGE MULTI-NIVEAUX SOUS INCERTITUDES DES DÉLAIS D'APPROVISIONNEMENT
O Ben-Ammar, H Marian, A Dolgui
9th International Conference on Modeling, Optimization & SIMulation, 10p, 2012
112012
MRP parameter evaluation under fuzzy lead times
O Ben-Ammar, R Guillaume, C Thierry
IFAC-PapersOnLine 49 (12), 1110-1115, 2016
92016
Optimization approaches for multi-level assembly systems under stochastic lead times
O Ben-Ammar, F Hnaien, H Marian, A Dolgui
Metaheuristics for Production Systems, 93-107, 2016
92016
A stochastic model for a two-level disassembly lot-sizing problem under random lead time
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Advances in Production Management Systems. The Path to Digital …, 2020
82020
Optimization for supply planning in multi-level assembly systems with stochastic lead-times
O Ben-Ammar, H Marian, A Dolgui
Industrial Engineering and Systems Management (IESM), Proceedings of 2013 …, 2013
72013
The system can't perform the operation now. Try again later.
Articles 1–20