Follow
Saman Aminbakhsh
Saman Aminbakhsh
Department of Civil Engineering, Atilim University
Verified email at atilim.edu.tr
Title
Cited by
Cited by
Year
Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
S Aminbakhsh, M Gunduz, R Sonmez
Journal of safety research 46, 99-105, 2013
5192013
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem
S Aminbakhsh, R Sonmez
Expert Systems with Applications 51, 177-185, 2016
1142016
Pareto front particle swarm optimizer for discrete time-cost trade-off problem
S Aminbakhsh, R Sonmez
Journal of Computing in Civil Engineering 31 (1), 04016040, 2017
512017
High-dimensional optimization of large-scale steel truss structures using guided stochastic search
SK Azad, S Aminbakhsh
Structures 33, 1439-1456, 2021
302021
Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem
R Sonmez, S Aminbakhsh, T Atan
Journal of Construction Engineering and Management 146 (8), 04020084, 2020
192020
A transformative solution for construction safety: Blockchain-based system for accident information management
S Ahmadisheykhsarmast, S Aminbakhsh, R Sonmez, F Uysal
Journal of Industrial Information Integration 35, 100491, 2023
122023
Multi-stage guided stochastic search for optimization and standardization of free-form steel double-layer grids
SK Azad, S Aminbakhsh, SSS Shaban
Structures 34, 678-699, 2021
102021
ε-constraint guided stochastic search with successive seeding for multi-objective optimization of large-scale steel double-layer grids
SK Azad, S Aminbakhsh
Journal of Building Engineering 46, 103767, 2022
92022
Tamsayılı Doğrusal Programlama Yöntemiyle Kesikli Zaman-Maliyet Ödünleşim Probleminin Optimal Pareto Çözümü
S Aminbakhsh, R Sonmez
4. Proje ve Yapım Yönetimi Kongresi, 2016
62016
Hybrid particle swarm optimization algorithm for obtaining pareto front of discrete time cost trade-off problem
S Aminbakhsh
Middle East Technical University, 2013
62013
Optimization-based Scheduling of Construction Projects with Generalized Precedence Relationships: A Real-Life Case Study
S Aminbakhsh, A Ahmed
Scientia Iranica, 2023
12023
Resource allocation capabilities of commercial project management software packages for resource leveling and resource constrained project scheduling problems: A comparative study
N Albayati, S Aminbakhsh
Journal of Construction Engineering, Management & Innovation 6 (2), 104, 2023
12023
Heuristic and Exact Methods for the Large-Scale Discrete Time-Cost Trade-off Problems
S Aminbakhsh
PhD Thesis, Civil Engineering Department, Middle East Technical University, 2018
12018
Pareto Front Optimization of Time and Cost: Application of Multi-Objective Optimization in Multi-Project Management
B Seyisoglu, R Sonmez, S Aminbakhsh
8th International Project and Construction Management Conference (IPCMC2024), 2024
2024
Optimizing Three-Dimensional Trade-Off Problem of Time–Cost–Quality over Multi-Mode Projects with Generalized Logic
S Aminbakhsh, AM Abdulsattar
Buildings 14 (6), 1676, 2024
2024
An ε-Constraint Method with Adaptive Mode Elimination Scheme for Multi-Objective Mixed Integer Programming
S Aminbakhsh
Creative Construction Conference (CCC2023), 2023
2023
Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses
S Aminbakhsh, R Sonmez, S Aminbakhsh, T Atan, M Bilir
5th International Project and Construction Management Conference (IPCMC 2018), 2018
2018
A Heuristic for Resource-Constrained Multi-Project Discrete Time-Cost Trade-Off Problem
B Seyisoglu, S Aminbakhsh, R Sonmez
5th International Project and Construction Management Conference (IPCMC 2018), 2018
2018
An efficient heuristic method for Pareto oriented optimization of timecost tradeoff problem for construction projects
S Aminbakhsh, R Sonmez
The XVIII Congress of the Portuguese Association of Operational Research, 2017
2017
Pareto Oriented Optimization of Discrete Time-Cost Trade-Off Problem Using Particle Swarm Optimization
S Aminbakhsh, R Sonmez
31st Annual ARCOM Conference (Association of Researchers in Construction …, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–20