Gompertz software reliability model: Estimation algorithm and empirical validation K Ohishi, H Okamura, T Dohi Journal of Systems and software 82 (3), 535-543, 2009 | 202 | 2009 |
Estimating software rejuvenation schedules in high-assurance systems T Dohi, K Goševa-Popstojanova, K Trivedi The Computer Journal 44 (6), 473-485, 2001 | 173 | 2001 |
Markovian arrival process parameter estimation with group data H Okamura, T Dohi, KS Trivedi IEEE/ACM Transactions on networking 17 (4), 1326-1339, 2009 | 142 | 2009 |
Statistical non-parametric algorithms to estimate the optimal software rejuvenation schedule T Dohi, K Goseva-Popstojanova, KS Trivedi Proceedings. 2000 Pacific Rim International Symposium on Dependable …, 2000 | 140 | 2000 |
Software reliability growth models with normal failure time distributions H Okamura, T Dohi, S Osaki Reliability Engineering & System Safety 116, 135-141, 2013 | 117 | 2013 |
Analysis of software cost models with rejuvenation T Dohi, K Goseva-Popstojanova, KS Trivedi Proceedings. Fifth IEEE International Symposium on High Assurance Systems …, 2000 | 110 | 2000 |
Optimal software release scheduling based on artificial neural networks T Dohi, Y Nishio, S Osaki Annals of Software engineering 8 (1), 167-185, 1999 | 97 | 1999 |
Optimal design of unreliable production–inventory systems with variable production rate BC Giri, WY Yun, T Dohi European Journal of Operational Research 162 (2), 372-386, 2005 | 92 | 2005 |
Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment T Dohi, H Okamura, S Osaki International Journal of Production Economics 74 (1-3), 147-155, 2001 | 89 | 2001 |
An iterative scheme for maximum likelihood estimation in software reliability modeling H Okamura, Y Watanabe, T Dohi 14th International Symposium on Software Reliability Engineering, 2003 …, 2003 | 86 | 2003 |
Metrics-based software reliability models using non-homogeneous Poisson processes K Shibata, K Rinsaka, T Dohi 2006 17th International Symposium on Software Reliability Engineering, 52-61, 2006 | 84 | 2006 |
Exact formulation of stochastic EMQ model for an unreliable production system BC Giri, T Dohi Journal of the Operational Research Society 56 (5), 563-575, 2005 | 70 | 2005 |
Inspection scheduling for imperfect production processes under free repair warranty contract BC Giri, T Dohi European Journal of Operational Research 183 (1), 238-252, 2007 | 68 | 2007 |
Distribution-free checkpoint placement algorithms based on min-max principle T Ozaki, T Dohi, H Okamura, N Kaio IEEE Transactions on Dependable and Secure Computing 3 (2), 130-140, 2006 | 68 | 2006 |
EM algorithm for discrete software reliability models: a unified parameter estimation method H Okamura, A Murayama, T Dohi Eighth IEEE International Symposium on High Assurance Systems Engineering …, 2004 | 66 | 2004 |
A refined EM algorithm for PH distributions H Okamura, T Dohi, KS Trivedi Performance Evaluation 68 (10), 938-954, 2011 | 65 | 2011 |
SRATS: Software reliability assessment tool on spreadsheet (Experience report) H Okamura, T Dohi 2013 IEEE 24th international symposium on software reliability engineering …, 2013 | 64 | 2013 |
An infinite server queueing approach for describing software reliability growth: Unified modeling and estimation framework T Dohi, S Osaki, KS Trivedi 11th Asia-Pacific Software Engineering Conference, 110-119, 2004 | 61 | 2004 |
Optimal security patch release timing under non-homogeneous vulnerability-discovery processes H Okamura, M Tokuzane, T Dohi 2009 20th international symposium on software reliability engineering, 120-128, 2009 | 57 | 2009 |
A multi-factor software reliability model based on logistic regression H Okamura, Y Etani, T Dohi 2010 IEEE 21st International Symposium on Software Reliability Engineering …, 2010 | 56 | 2010 |