Follow
Paz Pérez González
Paz Pérez González
Verified email at us.es
Title
Cited by
Cited by
Year
A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems
P Perez-Gonzalez, JM Framinan
European Journal of Operational Research 235 (1), 1-16, 2014
1532014
The distributed permutation flow shop to minimise the total flowtime
V Fernandez-Viagas, P Perez-Gonzalez, JM Framinan
Computers & Industrial Engineering 118, 464-477, 2018
1442018
Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures
JM Framinan, P Perez-Gonzalez, V Fernandez-Viagas
European Journal of Operational Research 273 (2), 401-417, 2019
1112019
Using real-time information to reschedule jobs in a flowshop with variable processing times
JM Framinan, V Fernandez-Viagas, P Perez-Gonzalez
Computers & Industrial Engineering 129, 113-125, 2019
652019
Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
V Fernandez-Viagas, P Perez-Gonzalez, JM Framinan
Computers & Operations Research 109, 77-88, 2019
582019
On heuristic solutions for the stochastic flowshop scheduling problem
JM Framinan, P Perez-Gonzalez
European Journal of Operational Research 246 (2), 413-420, 2015
572015
The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic
JM Framinan, P Perez-Gonzalez
Computers & Operations Research 88, 237-246, 2017
562017
New approximate algorithms for the customer order scheduling problem with total completion time objective
JM Framinan, P Perez-Gonzalez
Computers & Operations Research 78, 181-192, 2017
542017
Order scheduling with tardiness objective: Improved approximate solutions
JM Framinan, P Perez-Gonzalez
European Journal of Operational Research 266 (3), 840-850, 2018
482018
Single machine scheduling with periodic machine availability
P Perez-Gonzalez, JM Framinan
Computers & Industrial Engineering 123, 180-188, 2018
452018
Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times
P Perez-Gonzalez, V Fernandez-Viagas, MZ García, JM Framinan
Computers & Industrial Engineering 131, 131-145, 2019
392019
Relationship between common objective functions, idle time and waiting time in permutation flow shop scheduling
K Maassen, P Perez-Gonzalez, LC Günther
Computers & Operations Research 121, 104965, 2020
312020
Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
P Perez-Gonzalez, JM Framinan
Computers & Operations Research 36 (10), 2866-2876, 2009
302009
New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
C Talens, V Fernandez-Viagas, P Perez-Gonzalez, JM Framinan
Computers & Industrial Engineering 140, 106223, 2020
262020
Permutation flowshop scheduling with periodic maintenance and makespan objective
P Perez-Gonzalez, V Fernandez-Viagas, JM Framinan
Computers & Industrial Engineering 143, 106369, 2020
252020
Setting a common due date in a constrained flowshop: A variable neighbourhood search approach
P Perez-Gonzalez, JM Framinan
Computers & operations research 37 (10), 1740-1748, 2010
202010
The value of real-time data in stochastic flowshop scheduling: A simulation study for makespan
JM Framinan, P Perez-Gonzalez, VFV Escudero
2017 Winter Simulation Conference (WSC), 3299-3310, 2017
152017
Available-to-promise systems in the semiconductor industry: a review of contributions and a preliminary experiment
JM Framinan, P Perez-Gonzalez
2016 Winter Simulation Conference (WSC), 2652-2663, 2016
122016
From competitive to collaborative supply networks: A simulation study
R Rodriguez-Rodriguez, P Perez-Gonzalez, R Leisten
Applied Mathematical Modelling 35 (3), 1054-1064, 2011
122011
Assessing scheduling policies in a permutation flowshop with common due dates
P Perez-Gonzalez, JM Framinan
International Journal of Production Research 53 (19), 5742-5754, 2015
92015
The system can't perform the operation now. Try again later.
Articles 1–20