Follow
Bryan Tyrone Adey
Bryan Tyrone Adey
Verified email at ibi.baug.ethz.ch
Title
Cited by
Cited by
Year
Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall
BG de Soto, I Agustí-Juan, J Hunhevicz, S Joss, K Graser, G Habert, ...
Automation in construction 92, 297-311, 2018
2112018
Prediction of road accidents: A Bayesian hierarchical approach
M Deublein, M Schubert, BT Adey, J Köhler, MH Faber
Accident Analysis & Prevention 51, 274-291, 2013
1232013
Modeling of corrosion-induced concrete cover cracking: A critical analysis
A Jamali, U Angst, B Adey, B Elsener
Construction and Building Materials 42, 225-237, 2013
1222013
Construction automation: Research areas, industry concerns and suggestions for advancement
Q Chen, BG de Soto, BT Adey
Automation in construction 94, 22-38, 2018
1192018
Condition evolution in bridge management systems and corrosion-induced deterioration
G Roelfstra, R Hajdin, B Adey, E Brühwiler
Journal of Bridge Engineering 9 (3), 268-277, 2004
1012004
Concrete cover cracking owing to reinforcement corrosion–theoretical considerations and practical experience
U Angst, B Elsener, A Jamali, B Adey
Materials and corrosion 63 (12), 1069-1077, 2012
812012
Cyclic loading of end plate moment connections
BT Adey, GY Grondin, JJR Cheng
Canadian Journal of Civil Engineering 27 (4), 683-701, 2000
692000
Risk-based approach to the determination of optimal interventions for bridges affected by multiple hazards
B Adey, R Hajdin, E Brühwiler
Engineering structures 25 (7), 903-912, 2003
612003
Use of exponential hidden Markov models for modelling pavement deterioration
N Lethanh, BT Adey
International Journal of Pavement Engineering 14 (7), 645-654, 2013
482013
Determination of near‐optimal restoration programs for transportation networks following natural hazard events using simulated annealing
J Hackl, BT Adey, N Lethanh
Computer‐Aided Civil and Infrastructure Engineering 33 (8), 618-637, 2018
472018
Supply and Demand System Approach to Developing Bridge Management Strategies
B Adey, E Brühwiler, R Hajdin
9th International Bridge Management Conference, 3, 2003
472003
Methodology and base cost models to determine the total benefits of preservation interventions on road sections in Switzerland
BT Adey, T Herrmann, K Tsafatinos, J Lüking, N Schindele, R Hajdin
Structure and Infrastructure Engineering 8 (7), 639-654, 2012
462012
Estimating network related risks: A methodology and an application in the transport sector
J Hackl, JC Lam, M Heitzler, BT Adey, L Hurni
Natural Hazards and Earth System Sciences 18 (8), 2273-2293, 2018
452018
Life-cycle performance of deteriorating structures
DM Frangopol, E Brühwiler, MH Faber, B Adey
American Society of Civil Engineers, 2003
382003
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies
Q Chen, BT Adey, C Haas, DM Hall
Construction innovation 20 (3), 471-508, 2020
352020
A Bayesian network model to predict accidents on Swiss highways
M Deublein, M Schubert, BT Adey, B García de Soto
Infrastructure Asset Management 2 (4), 145-158, 2015
352015
Extended end plate moment connections under cyclic loading
BT Adey, JJ Cheng, GY Grondin
341997
Use of unmanned aerial vehicle photogrammetry to obtain topographical information to improve bridge risk assessment
J Hackl, BT Adey, M Woźniak, O Schümperlin
Journal of Infrastructure Systems, 04017041, 2018
322018
Overview of existing bridge management system
Z Mirzaei, BT Adey, L Klatter, PD Thompson
Bridge Management Committee, IABMAS, 2014
322014
Identifying enablers for coordination across construction supply chain processes: a systematic literature review
Q Chen, DM Hall, BT Adey, CT Haas
Engineering, construction and architectural management, 2020
312020
The system can't perform the operation now. Try again later.
Articles 1–20