Modeling supply chain dynamics: A multiagent approach JM Swaminathan, SF Smith, NM Sadeh Decision sciences 29 (3), 607-632, 1998 | 1426 | 1998 |
A learning system based on genetic adaptive algorithms SF Smith University of Pittsburgh, 1980 | 1074* | 1980 |
ISIS—a knowledge‐based system for factory scheduling MS Fox, SF Smith Expert systems 1 (1), 25-49, 1984 | 907 | 1984 |
Flexible Learning of Problem Solving Heuristics Through Adaptive Search. SF Smith IJCAI 83, 422-425, 1983 | 373 | 1983 |
A constraint-based method for project scheduling with time windows A Cesta, A Oddi, SF Smith Journal of Heuristics 8, 109-136, 2002 | 341 | 2002 |
Constructing and maintaining detailed production plans: Investigations into the development of kb factory scheduling SF Smith, MS Fox, PS Ow AI magazine 7 (4), 45-45, 1986 | 312 | 1986 |
Using genetic algorithms to schedule flow shop releases GA Cleveland, SF Smith Proceedings of the Third International Conference on Genetic Algorithms, 160-169, 1989 | 294 | 1989 |
Slack-based heuristics for constraint satisfaction scheduling SF Smith, CC Cheng AAAI, 139-144, 1993 | 253 | 1993 |
Competition-based induction of decision models from examples DP Greene, SF Smith Machine Learning 13, 229-257, 1993 | 250 | 1993 |
A methodology and architecture for reactive scheduling F Smith Intelligent scheduling, 29-66, 1994 | 248 | 1994 |
Wasp-like agents for distributed factory coordination VA Cicirello, SF Smith Autonomous Agents and Multi-agent systems 8, 237-266, 2004 | 217 | 2004 |
Cmradar: A personal assistant agent for calendar management PJ Modi, M Veloso, SF Smith, J Oh International Bi-Conference Workshop on Agent-Oriented Information Systems …, 2004 | 211 | 2004 |
Viewing scheduling as an opportunistic problem-solving process PS Ow, SF Smith Annals of Operations Research 12, 85-108, 1988 | 185 | 1988 |
Reactive scheduling systems SF Smith Intelligent scheduling systems, 155-192, 1995 | 183 | 1995 |
Knowledge-based production management approaches, results and prospects SF Smith Production planning & control 3 (4), 350-380, 1992 | 164 | 1992 |
Schedule-driven intersection control XF Xie, SF Smith, L Lu, GJ Barlow Transportation Research Part C: Emerging Technologies 24, 168-189, 2012 | 157 | 2012 |
An ontology for constructing scheduling systems SF Smith, MA Becker Working Notes of 1997 AAAI Symposium on Ontological Engineering, 120-127, 1997 | 155 | 1997 |
Managing wind‐based electricity generation in the presence of storage and transmission capacity Y Zhou, A Scheller‐Wolf, N Secomandi, S Smith Production and Operations Management 28 (4), 970-989, 2019 | 149 | 2019 |
Generating Robust Schedules through Temporal Flexibility. N Policella, SF Smith, A Cesta, A Oddi ICAPS 4, 209-218, 2004 | 139 | 2004 |
Applying constraint satisfaction techniques to job shop scheduling CC Cheng, SF Smith Annals of Operations Research 70 (0), 327-357, 1997 | 137 | 1997 |