Follow
Weng Tat Chan
Title
Cited by
Cited by
Year
Efficient planning of berth allocation for container terminals in Asia
A Imai, KI Nagaiwa, CW Tat
Journal of Advanced transportation 31 (1), 75-94, 1997
4061997
Construction resource scheduling with genetic algorithms
WT Chan, DKH Chua, G Kannan
Journal of construction engineering and management 122 (2), 125-132, 1996
3611996
Multiobjective optimization for pavement maintenance programming
TF Fwa, WT Chan, KZ Hoque
Journal of Transportation Engineering 126 (5), 367-374, 2000
2372000
Case-based reasoning approach in bid decision making
DKH Chua, DZ Li, WT Chan
Journal of construction engineering and management 127 (1), 35-45, 2001
2312001
Road-maintenance planning using genetic algorithms. I: Formulation
WT Chan, TF Fwa, CY Tan
Journal of transportation engineering 120 (5), 693-709, 1994
1971994
Neural network: an alternative to pile driving formulas
WT Chan, YK Chow, LF Liu
Computers and geotechnics 17 (2), 135-156, 1995
1901995
Peak-flow forecasting with genetic algorithm and SWMM
SY Liong, WT Chan, J ShreeRam
Journal of Hydraulic Engineering 121 (8), 613-617, 1995
1571995
Genetic-algorithm programming of road maintenance and rehabilitation
TF Fwa, WT Chan, CY Tan
Journal of Transportation Engineering 122 (3), 246-253, 1996
1551996
Road-maintenance planning using genetic algorithms. II: Analysis
TF Fwa, CY Tan, WT Chan
Journal of transportation engineering 120 (5), 710-722, 1994
1531994
Knowledge-based system for SWMM runoff component calibration
SY Liong, WT Chan, LH Lum
Journal of Water Resources Planning and Management 117 (5), 507-524, 1991
1461991
Constraint programming approach to precast production scheduling
WT Chan, H Hu
Journal of Construction Engineering and Management 128 (6), 513-521, 2002
1232002
Production scheduling for precast plants using a flow shop sequencing model
WT Chan, H Hu
Journal of computing in civil engineering 16 (3), 165-174, 2002
1172002
Construction operations simulation by microcomputer
BC Paulson Jr, WT Chan, CC Koo
Journal of construction engineering and management 113 (2), 302-314, 1987
1121987
Priority rating of highway maintenance needs by neural networks
TF Fwa, WT Chan
Journal of Transportation Engineering 119 (3), 419-432, 1993
1081993
Interface management for China’s build–operate–transfer projects
WT Chan, C Chen, JI Messner, DK Chua
Journal of Construction Engineering and Management 131 (6), 645-655, 2005
1002005
Derivation of Pareto front with genetic algorithm and neural network
SY Liong, ST Khu, WT Chan
Journal of Hydrologic Engineering 6 (1), 52-61, 2001
932001
Optimal vertical alignment analysis for highway design
TF Fwa, WT Chan, YP Sim
Journal of transportation engineering 128 (5), 395-402, 2002
912002
Backcalculation analysis of pavement-layer moduli using genetic algorithms
TF Fwa, CY Tan, WT Chan
Transportation research record 1570 (1), 134-142, 1997
891997
Constraint handling methods in pavement maintenance programming
WT Chan, TF Fwa, KZ Hoque
Transportation Research Part C: Emerging Technologies 9 (3), 175-190, 2001
862001
An application of genetic algorithms to precast production scheduling
WT Chan, H Hu
Computers & Structures 79 (17), 1605-1616, 2001
842001
The system can't perform the operation now. Try again later.
Articles 1–20