Impact of spare parts remanufacturing on the operation and maintenance performance of offshore wind turbines: a multi-agent approach M Dahane, M Sahnoun, B Bettayeb, D Baudry, H Boudhar Journal of Intelligent Manufacturing 28 (7), 1531-1549, 2017 | 42 | 2017 |
New dynamic heuristic for the optimization of opportunities to use new and remanufactured spare part in stochastic degradation context H Boudhar, M Dahane, N Rezg Journal of Intelligent Manufacturing 28 (2), 437-454, 2017 | 23 | 2017 |
Joint optimisation of spare parts demand and remanufacturing policy under condition-based maintenance for stochastic deteriorating manufacturing system H Boudhar, M Dahane, N Rezg IFAC Proceedings Volumes 46 (7), 414-419, 2013 | 11 | 2013 |
A new inspection heuristic for a condition-based maintenance policy in a spare part returns context H Boudhar, M Dahane, N Rezg 2013 IEEE International Conference on Systems, Man, and Cybernetics, 1300-1305, 2013 | 7 | 2013 |
Order/remanufacturing policy of spare part with recovery option for stochastic deteriorating system H Boudhar, M Dahane, N Rezg 2013 IEEE 18th Conference on Emerging Technologies & Factory Automation …, 2013 | 4 | 2013 |
Spare part returns in stochastic deteriorating manufacturing system under a condition-based maintenance policy: Simulation-based Genetic Algorithm approach H Boudhar, M Dahane, N Rezg IFAC Proceedings Volumes 46 (9), 1399-1404, 2013 | 4 | 2013 |
Optimisation de la politique de remanufacturing des pièces de rechange dans le cadre d'une maintenance intégrée à une chaîne logistique en boucle fermée H Boudhar Université de Lorraine, 2015 | | 2015 |
Optimisation of sequential inspection schema in multi-component deteriorating system context: heuristic based approach H Boudhar, M Dahane, N Rezg MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et …, 2014 | | 2014 |