Follow
Bijulal D
Bijulal D
Govt. Engineering College, Barton Hill, Thiruvananthapuram
Verified email at cet.ac.in
Title
Cited by
Cited by
Year
Service levels, system cost and stability of production–inventory control systems
D Bijulal, J Venkateswaran, N Hemachandra
International journal of production research 49 (23), 7085-7105, 2011
482011
Assesment and prediction of industrial workers' fatigue in an overhead assembly job
SA Binoosh, GM Mohan, D Bijulal
South African Journal of Industrial Engineering 28 (1), 164-175, 2017
142017
Closed-loop supply chain stability under different production-inventory policies
D Bijulal, J Venkateswaran
International Conference of the System Dynamics Society, 2008
122008
Zero bunching solution for a local public transport system with multiple-origins bus operation
S Sajikumar, D Bijulal
Public Transport 14 (3), 655-681, 2022
62022
Simulation-based analysis of service levels in stable production-inventory systems
J Venkateswaran, K Margabandu, D Bijulal, N Hemachandra
Proceedings of the System Dynamics Conference 2011, 2011
52011
Measuring total reward satisfaction: Scale Development and empirical validation for public sector employees in India
VR Hareendrakumar, S Subramoniam, D Bijulal
Metamorphosis 20 (2), 77-89, 2021
32021
Stability considerations and service level measures in production—inventory systems: a simulation study
D Bijulal, J Venkateswaran, N Hemachandra
2009 IEEE International Conference on Automation Science and Engineering …, 2009
32009
Closed-loop supply chains: the green practices in supply chains
AV Thomas, D Bijulal
22011
margabandu, K., and Bijulal, D.“Simulationbased Analysis of Service levels in Stable Production-Inventory Systems “
J Venkateswaran
2
Open Innovation Intellectual Property Risk Maturity Model: An Approach to Measure Intellectual Property Risks of Software Firms Engaged in Open Innovation
BS Arunnima, D Bijulal, R Sudhir Kumar
Sustainability 15 (14), 11036, 2023
2023
Correction to: Technology-Enabled Work-System Ensign
D Bijulal, V Regi Kumar, S Subramoniam, R Iqbal, V Khanzode
Technology-Enabled Work-System Design: Select Proceedings of HWWE 2018, C1-C1, 2022
2022
Technology-Enabled Work-System Design: Select Proceedings of HWWE 2018
D Bijulal, S Subramoniam, R Iqbal, V Khanzode
Springer, 2022
2022
Significance of Various Section Wise Operation Time in the Bunching Tendency of a Local Public Transport with Multiple Origins Bus Operation: A Case Study from Kerala; India
S Sajikumar, D Bijulal
61st 5th, 47, 2019
2019
Technology-Enabled Work-System Design
D Bijulal, VR Kumar, S Subramoniam, R Iqbal, V Khanzode
INNOVATION MATURITY-SCAPE: A BALANCED SCORECARD APPROACH TO MEASURING INNOVATION
BS ARUNNIMA, D BIJULAL, RS KUMAR, SV PILLAI
System Dynamics Simulation and Analysis of Production–Inventory Control Policies
D Bijulal
The system can't perform the operation now. Try again later.
Articles 1–16