David Chua Kim Huat
David Chua Kim Huat
Verified email at nus.edu.sg
Title
Cited by
Cited by
Year
Critical success factors for different project objectives
DKH Chua, YC Kog, PK Loh
Journal of construction engineering and management 125 (3), 142-150, 1999
8871999
Construction resource scheduling with genetic algorithms
WT Chan, DKH Chua, G Kannan
Journal of construction engineering and management 122 (2), 125-132, 1996
3321996
Key factors in bid reasoning model
DKH Chua, D Li
Journal of Construction Engineering and Management 126 (5), 349-357, 2000
2632000
Case-based reasoning approach in bid decision making
DKH Chua, DZ Li, WT Chan
Journal of construction engineering and management 127 (1), 35-45, 2001
2142001
Incident causation model for improving feedback of safety knowledge
DKH Chua, YM Goh
Journal of construction engineering and management 130 (4), 542-551, 2004
1762004
Model for construction budget performance—Neural network approach
DKH Chua, YC Kog, PK Loh, EJ Jaselskis
Journal of Construction Engineering and Management 123 (3), 214-222, 1997
1501997
Moving element method for train‐track dynamics
CG Koh, JSY Ong, DKH Chua, J Feng
International Journal for Numerical Methods in Engineering 56 (11), 1549-1567, 2003
1212003
Use of a WBS matrix to improve interface management in projects
DK Chua, M Godinot
Journal of construction engineering and management 132 (1), 67-79, 2006
1162006
Key determinants for construction schedule performance
YC Kog, DKH Chua, PK Loh, EJ Jaselskis
International Journal of Project Management 17 (6), 351-359, 1999
1161999
Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization
YM Goh, DKH Chua
Journal of Construction Engineering and Management 136 (2), 170-178, 2010
892010
Case-based reasoning for construction hazard identification: Case representation and retrieval
YM Goh, DKH Chua
Journal of Construction Engineering and Management 135 (11), 1181-1189, 2009
832009
Groundborne vibrations due to trains in tunnels
KH Chua, T Balendra, KW Lo
Earthquake engineering & structural dynamics 21 (5), 445-460, 1992
821992
Interface management for China’s build–operate–transfer projects
WT Chan, C Chen, JI Messner, DK Chua
Journal of Construction Engineering and Management 131 (6), 645-655, 2005
792005
Steady-state vibration of subway-soil-building system
T Balendra, KH Chua, KW Lo, SL Lee
Journal of engineering mechanics 115 (1), 145-162, 1989
781989
Neural network analysis of construction safety management systems: a case study in Singapore
YM Goh, D Chua
Construction Management and Economics 31 (5), 460-470, 2013
762013
Impacts of obstacles in East Asian cross-border construction
DKH Chua, Y Wang, WT Tan
Journal of Construction Engineering and Management 129 (2), 131-141, 2003
752003
Process-parameter-interface model for design management
DKH Chua, A Tyagi, S Ling, SH Bok
Journal of construction engineering and management 129 (6), 653-663, 2003
732003
Building response due to subway train traffic
KH Chua, KW Lo, T Balendra
Journal of geotechnical engineering 121 (11), 747-754, 1995
721995
A time-cost trade-off model with resource consideration using genetic algorithm
DKH Chua, WT Chan, K Govindan
Civil Engineering Systems 14 (4), 291-311, 1997
661997
Constraint-based planning with integrated production scheduler over internet
DKH Chua, LJ Shen, SH Bok
Journal of construction engineering and management 129 (3), 293-301, 2003
602003
The system can't perform the operation now. Try again later.
Articles 1–20