Christina Burt
Christina Burt
Computing and Information Systems, The University of Melbourne
Verified email at ms.unimelb.edu.au - Homepage
Title
Cited by
Cited by
Year
Case study and theory
M Hammersley, R Gomm, P Foster
Case study method, 234-258, 2000
370*2000
Corrigendum: Match factor for heterogeneous truck and loader fleets
C Burt, L Caccetta
International Journal of Mining, Reclamation and Environment 22 (1), 84-85, 2008
133*2008
Equipment selection for surface mining: a review
CN Burt, L Caccetta
Interfaces 44 (2), 143-162, 2014
952014
Models for Mining Equipment Selection
C Burt, L Caccetta, S Hill, P Welgama
MODSIM 2005 International Congress on Modelling and Simulation, 170-176, 2005
51*2005
An optimisation approach to materials handling in surface mines
CN Burt
Curtin University of Technology., 2008
412008
Equipment selection with heterogeneous fleets for multiple-period schedules
C Burt, L Caccetta, P Welgama, L Fouché
Journal of the Operational Research Society 62 (8), 1498-1509, 2011
252011
Literatür İnceleme: Stomalı Bireylere Yönelik Yayınların Türkiye Profili
F Vural, E Sütsünbüloğlu, D Şelimen
Turk J Colorectal Dis 26, 59-70, 2016
192016
Planning for mining operations with time and resource constraints
N Lipovetzky, C Burt, A Pearce, P Stuckey
Proceedings of the International Conference on Automated Planning and …, 2014
192014
A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
ML Blom, CN Burt, AR Pearce, PJ Stuckey
INFORMS Journal on Computing 26 (4), 658-676, 2014
152014
Equipment selection for mining: with case studies
CN Burt, L Caccetta
Springer, 2018
122018
An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
C Burt, L Caccetta, L Fouché, P Welgama
Journal of Industrial and Management Optimization, 2013
102013
Scheduling with fixed maintenance, shared resources and nonlinear feedrate constraints: a mine planning case study
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
International Conference on Integration of Constraint Programming …, 2015
52015
Approximate Uni-directional Benders Decomposition
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Planning, Search and Optimization Workshop: AAAI 2015, 2014
42014
Exact models for the k-connected minimum energy problem
C Burt, Y Chan, N Sonenberg
International Conference on Ad Hoc Networks, 392-406, 2009
32009
Erratum to: Equipment Selection for Mining: With Case Studies
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, E1-E1, 2018
22018
Delivering on delivery: Optimisation and the future of vehicle routing
C Burt, P Hart, D Petrova, A West
Operations Research Proceedings 2017, 747-752, 2018
22018
Methodology: Preliminaries and Background
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, 11-23, 2018
22018
Accurate costing in mixed integer utilisation mining models
C Burt, Y Chan
18th World IMACS Congress and MODSIM09 International Congress On Modelling …, 2009
22009
Algorithms for the power-p Steiner tree problem in the Euclidean plane
C Burt, A Costa, C Ras
Revista de Informática Teórica e Aplicada 25 (4), 28-42, 2018
2018
Multi-objective Large-Scale Staff Allocation
R Anzaldua, C Burt, H Edmonds, K Lehmann, G Song
Operations Research Proceedings 2017, 573-579, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20