Occupational health and safety in the industry 4.0 era: A cause for major concern? A Badri, B Boudreau-Trudel, AS Souissi Safety science 109, 403-411, 2018 | 374 | 2018 |
Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times I Kacem, C Chu, A Souissi Computers & operations research 35 (3), 827-844, 2008 | 99 | 2008 |
Minimizing total tardiness on a single machine with sequence-dependent setup times A Souissi, I Kacem, C Chu 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat …, 2004 | 8 | 2004 |
New lower bound for minimizing total tardiness on a single machine with sequence-dependent setup times A Souissi, I Kacem, C Chu Proceedings of the Ninth International Conference on Project Management and …, 2004 | 8 | 2004 |
Minimising the sum of the completion time with availability constraint: comparaison of branch and bound method and integer linear programming I Kacem, C Chu, A Souissi International Conference of Industrial Engineering and Systems Management …, 2005 | 7 | 2005 |
Minimiser le makespan avec prise en compte de contrainte d’indisponibilité sur une seule machine A Souissi, I Kacem, C Chu Valensciences 5, 191-206, 2006 | 6 | 2006 |
Minimizing the weighted sum of completion times with availability constraint: comparison of branch and bound method and integer linear programming I Kacem, C Chu, A Souissi IESM 2005, 2005 | 5 | 2005 |
Ordonnancement avec prise en compte des indisponibilités dépendantes et indépendantes AS Souissi Troyes, 2005 | 1 | 2005 |
Minimiser le makespan avec prise en compte d'indisponibilité sur une seule machine A Souissi, I Kacem, C Chu ROADEF 2006, 2006 | | 2006 |