Follow
Maristela Oliveira  Santos
Maristela Oliveira Santos
Other namesMaristela Oliveira dos Santos, Maristela Santos, Maristela O. Santos
Instituto de CIências Matemáticas e de Computação
Verified email at icmc.usp.br - Homepage
Title
Cited by
Cited by
Year
Integrated pulp and paper mill planning and scheduling
MO Santos, B Almada-Lobo
Computers & Industrial Engineering 63 (1), 1-12, 2012
992012
An optimization approach for the lot sizing and scheduling problem in the brewery industry
TA Baldo, MO Santos, B Almada-Lobo, R Morabito
Computers & Industrial Engineering 72, 58-71, 2014
922014
Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs
PB Macedo, D Alem, M Santos, ML Junior, A Moreno
The International Journal of Advanced Manufacturing Technology 82, 1241-1257, 2016
602016
A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry
G Figueira, MO Santos, B Almada-Lobo
Computers & Operations Research 40 (7), 1804-1818, 2013
562013
An integrated approach for production lot sizing and raw material purchasing
AL Cunha, MO Santos, R Morabito, A Barbosa-Póvoa
European Journal of Operational Research 269 (3), 923-938, 2018
452018
Parallel local search algorithms for high school timetabling problems
L Saviniec, MO Santos, AM Costa
European Journal of Operational Research 265 (1), 81-98, 2018
452018
Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines
M Furlan, B Almada-Lobo, M Santos, R Morabito
Computers & Operations Research 59, 33-50, 2015
302015
BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem
MM Furlan, MO Santos
Journal of Intelligent Manufacturing 28, 929-944, 2017
282017
Models for the two-dimensional level strip packing problem–a review and a computational evaluation
VMR Bezerra, AAS Leao, JF Oliveira, MO Santos
Journal of the Operational Research Society 71 (4), 606-627, 2020
262020
Pattern-based models and a cooperative parallel metaheuristic for high school timetabling problems
L Saviniec, MO Santos, AM Costa, LMR dos Santos
European Journal of Operational Research 280 (3), 1064-1081, 2020
242020
Logística de distribuição de água em redes urbanas: racionalização energética
F Toledo, MO Santos, MN Arenales, P Seleghim Júnior
Pesquisa Operacional 28, 75-91, 2008
232008
The constrained compartmentalized knapsack problem: mathematical models and solution methods
AAS Leão, MO Santos, R Hoto, MN Arenales
European journal of operational research 212 (3), 455-463, 2011
212011
An adaptive hybrid metaheuristic for permutation flowshop scheduling
J Moccellin, M Santos
Control and Cybernetics 29 (3), 761-771, 2000
212000
MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products
WAO Soler, MO Santos, K Akartunalı
Journal of the Operational Research Society 72 (8), 1691-1706, 2021
192021
Infeasibility handling in genetic algorithm using nested domains for production planning
MO Santos, S Massago, B Almada-Lobo
Computers & operations research 37 (6), 1113-1122, 2010
172010
Meta-heuristics for the one-dimensional cutting stock problem with usable leftover
SV Ravelo, CN Meneses, MO Santos
Journal of Heuristics 26, 585-618, 2020
152020
Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: Analyzing two different situations
TA Baldo, R Morabito, MO Santos, L Guimarães
Mathematical Problems in Engineering 2017, 2017
132017
Otimização dos custos de energia elétrica na programação da captação, armazenamento e distribuição de água
EM Soler, FMB Toledo, MO Santos, MN Arenales
Production 26, 385-401, 2015
132015
An approach using Lagrangian/surrogate relaxation for lot-sizing with transportation costs
F Molina, MO Santos, F Toledo, SA Araujo
Pesquisa Operacional 29, 269-288, 2009
112009
Otimização da programação da produção de bebidas à base de frutas por meio de modelos de programação inteira mista
MS Pagliarussi, R Morabito, MO Santos
Gestão & Produção 24, 64-77, 2016
102016
The system can't perform the operation now. Try again later.
Articles 1–20